The Cincinnati and Wooster team first assembled the coring platform that would then be launched into 10 meters of water and the over 10-meter core would then be extracted meter-by-meter.
The Cincinnati and Wooster team first assembled the coring platform that would then be launched into 10 meters of water and the over 10-meter core would then be extracted meter-by-meter.